linkedin
background
Edificius logo

Edificius

Brand: ACCA

Be the first to Reviews

Write a Review

Have Questions?

Edificius is not only a BIM software, but an integrated solution. Edificius is the full professional solution to satisfy your 3D Design needs in the world of architecture. With Edificius and the BIM modelling from 2D/3D architectural design, you can dynamically update your architectural drawings and all the project documentation (floor plans, cross-sections, elevation views, axonometries, isometric cut-away illustrations, perspectives, architectural reports, tables and schedules, land elevation ...Read more

img

Get Free Expert Consultation

Let us know your business needs clearly

Advice

Verified & Trusted
Vendors

Payment

Safe & Secure
Payment

Guaranteed

Personalized
Experts Support

Starting at

AED 210.81 /Month

Features

  • check_icon BIM modeling with parametric architectural objects
  • check_icon Garden, exterior spaces & landscaping design
  • check_icon Textures library, CAD blocks
  • check_icon Real Time Rendering and BIM
  • check_icon Edificius-VR
  • See all img

Edificius Software Pricing, Features & Reviews

Edificius is not only a BIM software, but an integrated solution. Edificius is the full professional solution to satisfy your 3D Design needs in the world of architecture. With Edificius and the BIM modelling from 2D/3D architectural design, you can dynamically update your architectural drawings and all the project documentation (floor plans, cross-sections, elevation views, axonometries, isometric cut-away illustrations, perspectives, architectural reports, tables and schedules, land elevation profiles).

Edificius Pricing & Plans

Monthly License
  • BIM Modeling
  • Real-time Rendering
  • Collaboration
  • Integration
  • Cost Estimation
  • Construction Documentation
  • Parametric Design
  • Terrain Modeling
    • Licenses
    • Monthly
Starting at AED 210.81

Get Edificius Demo

We make it happen! Get your hands on the best solution based on your needs.

Interacted

Edificius Features

  • icon_check BIM modeling with parametric architectural objects With Edificius from the simple straight-forward use of parametric architectural objects (beams, pillars, walls, etc.),
  • icon_check Garden, exterior spaces & landscaping design Edificius is a simple to use tool that effectively fuses architecture and landscape design. A BIM modelling environment designed
  • icon_check Textures library, CAD blocks The on-line BIM Objects Library contains tens of thousands of free design resources already optimized for use in Edificius (HD
  • icon_check Real Time Rendering and BIM Thanks to the Edificius-RTBIM module, Edificius is the first BIM software that integrates Real Time Rendering and BIM to produce
  • icon_check Edificius-VR With Edificius-VR you can publish your 3D models on the BIM Voyager online platform and share them with whoever you want.
  • icon_check Working drawings, construction documents, schedule With Edificius you can compose your drawing models with great freedom with simple drag & drops.
  • icon_check Import/Export in IFC standard format Edificius can import and export in the standard IFC format. IFC is the “common” file format that allows all team designers
  • icon_check Built and Demolished elements Edificius is the ideal solution for preparing renovation works or work variation surveys. In a unique design environment, you can

Edificius Specifications

  • Supported Platforms :
  • Device:
  • Deployment :
  • Suitable For :
  • Business Specific:
  • Business Size:
  • Customer Support:
  • Training:
  • Language:
  • Ubuntu Windows MacOS Linux
  • Desktop
  • Cloud-Based
  • Architecture
  • All Businesses
  • Small Business, Startups, Medium Business, Enterprises
  • Email, Live Chat, Communities
  • Videos
  • English

Edificius Reviews and Ratings

banner

Would you like to review this product?

Submit Reviews

ACCA Company Details

Brand Name ACCA
Information ACCA has established a strong position in developing software solutions for the architectural, engineering and construction industries well known for ease of use, its highly creative and practical approach.
Founded Year 1989
Director/Founders Guido Cianciulli
Company Size 101-500 Employees
Other Products EdiLus CONCRETE, EdiLus MASONRY, EdiLus STEEL, Primus IFC, Primus TAKEOFF

Edificius FAQ

A Edificius Architecture Design Software is compatible with Windows operating systems.
A Edificius Architecture Design Software app is not available.
A Edificius Architecture Design Software supports Web-Based.
A Edificius Architecture Design Software pricing starts at Rs.4612.00.
A Edificius Architecture Design Software is typically used in Architecture.
A Edificius Architecture Design Software demo is available for free with Techjockey.com
A Edificius Architecture Design Software offers a free trial. However, the premium plan with advanced features available at Techjockey .
A For Edificius Architecture Design Software installation, insert the given CD/USB flash storage in your system and open the Setup Wizard to get started.
A Edificius Architecture Design Software helps with BIM modeling with parametric architectural objects,Garden, exterior spaces & landscaping design and Textures library. It's a complete solution for CAD blocks,Real Time Rendering and BIM,Edificius-VR and Working drawings.

Edificius Alternatives

See All

20,000+ Software Listed 20,000+ Software Listed

Best Price Guaranteed Unbiased Comparison

Free Expert Consultation Read Authentic Reviews

2M+ Happy Customers 500,000+ Monthly Users