linkedin
background
Edificius logo

Edificius

Brand: ACCA

Be the first to Reviews

Write a Review

Have Questions?

img

Get Free Expert Consultation

Let us know your business needs clearly

Advice

Verified & Trusted
Vendors

Payment

Safe & Secure
Payment

Guaranteed

Personalized
Experts Support

Starting at

$ 139.63 /Month

Features

  • check_icon BIM modeling with parametric architectural objects
  • check_icon Garden, exterior spaces & landscaping design
  • check_icon Textures library, CAD blocks
  • check_icon Real Time Rendering and BIM
  • check_icon Edificius-VR
  • See all img

Edificius Software Pricing, Features & Reviews

Edificius is not only a BIM software, but an integrated solution. Edificius is the full professional solution to satisfy your 3D Design needs in the world of architecture.

Edificius Pricing & Plans

Monthly License
  • BIM Modeling
  • Real-time Rendering
  • Collaboration
  • Integration
  • Cost Estimation
  • Construction Documentation
  • Parametric Design
  • Terrain Modeling
    • Licenses
    • Monthly
Starting at $ 139.63

Get Edificius Demo

We make it happen! Get your hands on the best solution based on your needs.

Interacted

Edificius Features

  • icon_check BIM modeling with parametric architectural objects With Edificius from the simple straight-forward use of parametric architectural objects (beams, pillars, walls, etc.),
  • icon_check Garden, exterior spaces & landscaping design Edificius is a simple to use tool that effectively fuses architecture and landscape design. A BIM modelling environment designed
  • icon_check Textures library, CAD blocks The on-line BIM Objects Library contains tens of thousands of free design resources already optimized for use in Edificius (HD
  • icon_check Real Time Rendering and BIM Thanks to the Edificius-RTBIM module, Edificius is the first BIM software that integrates Real Time Rendering and BIM to produce
  • icon_check Edificius-VR With Edificius-VR you can publish your 3D models on the BIM Voyager online platform and share them with whoever you want.
  • icon_check Working drawings, construction documents, schedule With Edificius you can compose your drawing models with great freedom with simple drag & drops.
  • icon_check Import/Export in IFC standard format Edificius can import and export in the standard IFC format. IFC is the “common” file format that allows all team designers
  • icon_check Built and Demolished elements Edificius is the ideal solution for preparing renovation works or work variation surveys. In a unique design environment, you can

Edificius Specifications

  • Supported Platforms :
  • Device:
  • Deployment :
  • Suitable For :
  • Business Specific:
  • Business Size:
  • Customer Support:
  • Training:
  • Language:
  • Ubuntu Windows MacOS Linux
  • Desktop
  • Cloud-Based
  • Architecture
  • All Businesses
  • Small Business, Startups, Medium Business, Enterprises
  • Email, Live Chat, Communities
  • Videos
  • English

Edificius Reviews and Ratings

banner

Would you like to review this product?

Submit Reviews

ACCA Company Details

Brand Name ACCA
Information ACCA has established a strong position in developing software solutions for the architectural, engineering and construction industries well known for ease of use, its highly creative and practical approach.
Founded Year 1989
Director/Founders Guido Cianciulli
Company Size 101-500 Employees
Other Products EdiLus CONCRETE, EdiLus MASONRY, EdiLus STEEL, Primus IFC, Primus TAKEOFF

Edificius FAQ

A Edificius Architecture Design Software is compatible with Windows operating systems.
A Edificius Architecture Design Software app is not available.
A Edificius Architecture Design Software supports Web-Based.
A Edificius Architecture Design Software pricing starts at Rs.4612.00.
A Edificius Architecture Design Software is typically used in Architecture.
A Edificius Architecture Design Software demo is available for free with Techjockey.
A Edificius Architecture Design Software offers a free trial. However, the premium plan with advanced features available at Techjockey.
A For Edificius Architecture Design Software installation, insert the given CD/USB flash storage in your system and open the Setup Wizard to get started.
A Edificius Architecture Design Software helps with BIM modeling with parametric architectural objects,Garden, exterior spaces & landscaping design and Textures library. It's a complete solution for CAD blocks,Real Time Rendering and BIM,Edificius-VR and Working drawings.

Edificius Alternatives

See All