linkedin
background
XMind logo

XMind

Brand: Xmind

4

1 Rating & 1 Review

Have Questions?

XMind 8 is a dynamic mind mapping solution that helps elite businesses streamline their organizational structure and makes them function with ease. The system offers a multitude of structures and templates along with features such as brainstorming, presentation mode, Gantt charts and many others, which facilitates the intuitive presentation of relationships between key concepts. The powerful presentation tool offered by XMind 8 comes equipped with a walk-through mode of its o...Read more

img

Get Free Expert Consultation

Let us know your business needs clearly

Advice

Verified & Trusted
Vendors

Payment

Safe & Secure
Payment

Guaranteed

Personalized
Experts Support

Starting at

$ 10.00 /Month

Features

  • check_icon Mind Map Creation
  • check_icon AI Map Generation
  • check_icon Template Library
  • check_icon Gantt View
  • check_icon Export & Import Options
  • See all img

XMind Software Pricing, Features & Reviews

What is XMind 8?

XMind 8 is a dynamic mind mapping solution that helps elite businesses streamline their organizational structure and makes them function with ease. The system offers a multitude of structures and templates along with features such as brainstorming, presentation mode, Gantt charts and many others, which facilitates the intuitive presentation of relationships between key concepts. The powerful presentation tool offered by XMind 8 comes equipped with a walk-through mode of its own. 

Moreover, organizations can drill down on specific topics and subtopics by generating temporary mind maps without actual deviation. An advanced information card feature enables users to embed topic-related details that are necessary for containing notes, labels and hyperlinks within a single platform. Regarding security, organizations can secure all XMind files with differentiated passwords for active and enhanced protection.  

How does the Mind Toolbox by XMind 8 facilitate office collaboration?

  1. Relationship: The relationship line between any two topics on the map can be customized with different colors, shapes or added word descriptions to emphasize the meaning of the special connection.
  2. Summary: The system adds summary topics for selected contents at an important juncture of your divergent mind map and like other topics, it can also be used to change the style and get extended to subtopics.
  3. Marker: Markers, within mind maps are used to express specific significance such as progress, risk, feeling, priority and more.
  4. Label: Labels are plain text tags that are attached to topics for categorization and annotation purposes. A topic can have multiple labels attached to it.
  5. Note: You can annotate a particular topic with notes. Organizations can also generate new notes and edit existing ones with ease. 
  6. Callout: With callout, you can insert additional texts within a particular topic and also breed sub-topics with ease. 

Pricing of XMind 8

The pricing of XMind 8 starts from $10.. To know more about the software, request for a callback by our executives. Our in-house product experts will get back to you mentioned in your call back request.

Compatible Platforms for XMind 8

The software is compatible with Windows, Mac and Linux Operating systems. It also has a dedicated mobile app for Android and iOS devices. 

Benefits of XMind 8

  1. Business Charts: With XMind 8, users get access to 4 different types of charts,  improving their overall efficiency levels in real-time. Casual dynamics between complex ideas/events get organized with Fishbone charts. Matrix Charts are used for in-depth comparative analysis. Individual milestones and schedules get tracked in chronological order with timeline. Organisation charts are used to present an organizational overview.
  2. Evernote: Integration with Evernote enables users to save their maps as notes and share the same with team members for enhanced collaboration. Users can also save individual maps in the forms of large images, outline texts or .xmind files.
  3. Fonts And Themes: A pack of 10 cross-platform and open-source fonts ensure enhanced visual presentation of maps on both Windows and Mac devices. Furthermore, users can also design their own themes using the “Theme Editor”.

XMind Pricing & Plans

Pro
  • Add numbering and tasks
  • SVG, markdown, and more export formats
  • Unlimited slides in Pitch
  • Unlimited colored branches
  • Add equations, topic links, and attachements
  • Add numbering and tasks
    • Licenses
    • Monthly
Starting at $ 10.00
Premium
  • Unlimited storage space
  • Unlimited collaborative files
  • Everything in Pro
  • 500 credits per month
  • AI-generated to-dos
  • Unlimited storage space
    • Licenses
    • Monthly
Starting at $ 15.00

Get XMind Demo

We make it happen! Get your hands on the best solution based on your needs.

Interacted

XMind Features

  • icon_check Mind Map Creation Create visually structured mind maps to organize thoughts, concepts, plans, and information in a clear, hierarchical layout.
  • icon_check AI Map Generation Automatically generate mind maps from keywords or prompts, accelerating brainstorming and reducing manual layout effort.
  • icon_check Template Library Provides professional templates for study notes, planning, design thinking, business analysis, and brainstorming sessions.
  • icon_check Gantt View Converts project-related mind maps into Gantt charts for task scheduling, milestone tracking, and timeline visualization.
  • icon_check Export & Import Options Supports export to PDF, PNG, Markdown, Word, Excel, PowerPoint, and import from OPML or other mind map formats.
  • icon_check Password Protection Allows protecting sensitive maps with passwords to ensure privacy and security for personal or confidential projects.
  • icon_check Styling & Themes Customize fonts, colors, branch shapes, and layout styles to create polished visual maps with strong design aesthetics.
  • icon_check In-app Collaboration Share and co-create effectively within the app.
  • icon_check Grid Structure Efficiently organize complex information to boost productivity.
  • icon_check Relationship Tool Connect two relevant ideas with customizable lines and text.
  • icon_check Notes Add additional text information into extendable notes for detailed explanations.
  • icon_check Brainstorming Facilitate brainstorming sessions with real-time collaboration tools.
  • icon_check Colorful Branches Apply different colors for each branch to create visually rich maps.
  • icon_check Map Shot Capture any part of your map and adjust the format for display and viewing.

XMind Specifications

  • Supported Platforms :
  • Device:
  • Deployment :
  • Suitable For :
  • Business Specific:
  • Business Size:
  • Customer Support:
  • Training:
  • Language:
  • AI Features:
  • Windows iOS Android
  • DesktopMobileTabletiPad
  • Cloud-Based
  • All Industries
  • All Businesses
  • Small Business, Startups, Medium Business, Enterprises
  • Email, Communities
  • Videos
  • English
  • AI Integrated

XMind Review

100%

Have recommended this product

Overall Score

4/5
Based on 1 Review

Review this product

Your valuable feedback helps others like you make a better decision.

SG

Sarthak Gupta

Verified reviewer:linkedin_verify

Associate Product Manager, E-commerce

101-500 Employees

Software user since: < 6 months

Reviewed on: Jan 19, 2023

4/5

“The perfect tool for brainstorming”

Pros :

Cons :

Reason to switch : Xmind helps me with journey mapping and it's very intuitive.

Features

4/5

Value for Money

4/5

Customer Support

4/5

Ease of Use

4/5

Likely to Recommend

10/10

XMind FAQ

A XMind 8 Mind Mapping Software is compatible with Windows, IOS and Android operating systems.
A XMind 8 Mind Mapping Software app is available for , Mobile, Tablet and iPad.
A XMind 8 Mind Mapping Software supports Web-Based.
A XMind 8 Mind Mapping Software is typically used in All Industries.
A XMind 8 Mind Mapping Software demo is available for free with Techjockey.com
A XMind 8 Mind Mapping Software offers a free trial. However, the premium plan with advanced features available at Techjockey .
A For XMind 8 Mind Mapping Software installation, insert the given CD/USB flash storage in your system and open the Setup Wizard to get started.
A XMind 8 Mind Mapping Software helps with Working with Office/PDF,Templates,Slide-Base Presentation and Gantt View. It's a complete solution for Brainstorming.
A The pricing of XMind 8 starts from $10.

XMind Alternatives

See All